CF1761916720707-tsm20251029173950

WWW.RTSAK.COM - daydreamsproject.com

Search for IP or hostnames:

daydreamsproject.com checked at 2025-10-31T13:18:40.616Z 506ms 98/98/98 100% R:6

daydreamsproject.com

NSns71.domaincontrol.com
A2603:5:2194::2e ๐Ÿ‡บ๐Ÿ‡ธ GODADDY-DNS-GLOBAL
PTRns71.domaincontrol.com
A97.74.105.46๐Ÿ‡บ๐Ÿ‡ธ GODADDY-DNS-GLOBAL
PTRns71.domaincontrol.com
NSns72.domaincontrol.com
A2603:5:2294::2e ๐Ÿ‡บ๐Ÿ‡ธ GODADDY-DNS-GLOBAL
PTRns72.domaincontrol.com
A173.201.73.46๐Ÿ‡บ๐Ÿ‡ธ GODADDY-DNS-GLOBAL
PTRns72.domaincontrol.com
MXmailstore1.secureserver.net
A216.69.141.78๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp01-v02.prod.phx3.secureserver.net
A216.69.141.114๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp03-v02.prod.phx3.secureserver.net
A216.69.141.162๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp02-v02.prod.phx3.secureserver.net
MXsmtp.secureserver.net
A216.69.141.71๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp01-v01.prod.phx3.secureserver.net
A216.69.141.84๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp02-v01.prod.phx3.secureserver.net
A216.69.141.113๐Ÿ‡บ๐Ÿ‡ธ AS398101
PTRosplibsmtp03-v01.prod.phx3.secureserver.net
A3.33.130.190๐Ÿ‡บ๐Ÿ‡ธ Amazon
PTRa2aa9ff50de748dbe.awsglobalaccelerator.com
A15.197.148.33๐Ÿ‡บ๐Ÿ‡ธ Amazon
PTRa2aa9ff50de748dbe.awsglobalaccelerator.com

com

NSa.gtld-servers.net
NSb.gtld-servers.net
NSc.gtld-servers.net
NSd.gtld-servers.net
NSe.gtld-servers.net
NSf.gtld-servers.net
NSg.gtld-servers.net
NSh.gtld-servers.net
NSi.gtld-servers.net
NSj.gtld-servers.net
NSk.gtld-servers.net
NSl.gtld-servers.net
NSm.gtld-servers.net

Starts with same word

Starts similarily

AI analysis

daydreamsproject.com points to two IPs: 3.33.130.190 and 15.197.148.33.

Other host names, for instance explainmeme.com, sajeel.org, reliancespa.in, amcored.com and tsihcorp.com share IP numbers with daydreamsproject.com.

Two name servers ns71.domaincontrol.com and ns72.domaincontrol.com are delegated to daydreamsproject.com.

daydreamsproject.com uses the same name server configuration as other domains, such as cpap.expert, top3ds.com, magic-mushroom-growkits.net, itzinger.com and fajl.me.

Host names with two IPs:

ns71.domaincontrol.com points to 2603:5:2194::2e and 97.74.105.46.

ns72.domaincontrol.com points to 2603:5:2294::2e and 173.201.73.46.

Two mail servers handle daydreamsproject.com: mailstore1.secureserver.net and smtp.secureserver.net.

daydreamsproject.com shares the same mail server setup as other domains, including edmontondemo.com, ranchoperformancecenters.net, locertified.com, vacanzepersingle.com and img.pictures.

daydreamsproject.com shares some mail servers with other domains, at least partially, for instance idolcult.com.

Host names with three IP numbers:

mailstore1.secureserver.net points to 216.69.141.78, 216.69.141.114 and 216.69.141.162; smtp.secureserver.net points to 216.69.141.71, 216.69.141.84 and 216.69.141.113.

Perform reverse DNS lookup as well as normal forward DNS. Check Autonomous System Numbers (ASNs) and BGP connections between Internet Service Providers.
dbq

YjkqqPh CF johedugfp 2025-10-31